On Monday, the workers put the forms in for the footings and an inspector came to look at them. Steven said the inspector looked at the site for a few minutes, then got in his car and sat for a few minutes, then he and all the workers left. Then Steven got an email an hour later that it passed inspection. Yay!


So on Tuesday they poured the footings!Β After they drained out all the water from that morning’s storm (we got 2 inches of rain in an hour).




I know this picture doesn’t show much, but I am taking the same picture each day so I can see progress from the same POV.

On Wednesday they started putting up forms for the rest of the foundation,



and they worked on the forms a bit more Thursday, and added the rebar.



They had to pump water out of the site each morning because we kept getting so much rain overnight.

On Friday, the added Styrofoam and blocking in to the forms to block out the openings for the doors, as well as the ledge in the garage itself. The ledge is to set the slab on, and so that the foundation wall doesn’t take up more space in the garage, as shown in the detail below.


The inspector came by in the afternoon and approved everything. They have a few more things to do next Monday then they will pour Tuesday!