When we first toured our home, we noticed the floors weren’t level, and knew we’d have to fix them at some point (as much fun as it is to watch the cats’ ball toys roll to the lowest points of the house, ha). We started working on one of the unlevel areas in June 2016 when we put jacks in the basement where two joists were being crushed due to faulty loading. We replaced one joist in August 2016 (it was a priority to get done then, due to work going on two floors above), and – drumroll, please! – replaced the other one this weekend!!! Other parts of the house remain unlevel, but it’s exciting to make progress!

As I mentioned, when Steven and I started clearing the way for this joist replacement project, we found some wackadoodle construction under our first floor stair landing, so he and my dad took care of that during this project, too. But the first priority was the joist.

They picked up the new joist – a $19 2×10 – on Thursday night. Kind of funny to think all of this work is being done to put in a piece of lumber that costs less than $20!

And they got to work Friday afternoon. Despite our previous weekend’s work of clearing all the odd wood framing out from around the ductwork, they still had more to clear out to be able to get the joist in. You can see in the photo below that there was a lot of wood and conduit around the joist, and the stairs behind it were also in the way.

So a lot of Friday was more demolition! They ended up cutting out the drywall above the brick wall to expose the joist.

View from the other side:

They also took down a lot of ductwork and started demolishing the goofy stair platform. You can see in the photo that there was a double platform – which had no point to it. There used to be a post there too, which supported the platform. But they rebuilt it in a way that the post is no longer required!

Old photo:

 

They did put a jack there in the meantime though.

They kept working on Friday until they were able to get the joist in, which required cutting out part of the stair (and not taking the whole thing out THANK HEAVENS), turning off the power and moving some of the conduit. But they got it in. Yay! (This joist is under the wall next to the dining room, which is why they told me and Mom to move when we were playing Blokus in there!)

On Saturday, they focused on rebuilding the stair platform, and redesigning the ductwork that went underneath it. The wood supporting the platform hangs off of the new joist they put in, so a post is no longer required. Before, it relied on it <— dumb design.

Some of the old bottom platform was structurally supportive at the foundation wall, so they put blocking in between the old pieces, to support it more.

As you can tell, I don’t have very good before pictures (dammit, that is my job!) but the ductwork used to be below the second platform. Since they were taking that out, and rebuilding it, the ductwork could curve up, and we could have more head space there! Woo hoo!

They spent a lot of time redesigning the ductwork, and cleaning out what they were reusing (they used some new pieces, too). Then they put it all back together, and the project was DONE!

And now, we have this pile in our basement, and everything is covered in dust! But that’s how it goes with these projects. Although, what the hell was going on in the previous “design” that they had this much extra wood hanging around?! Seriously?!?!

Ha, I made them take this photo on Sunday.

Thanks for all your hard work, Steven and Dad! Dad, we’ll let you know what the next project will be for your spring visit!

If you made it this far, and can follow all of this, thanks for reading! I will be better about taking before and after shots from the same angle for future projects (because you KNOW we are going to have them)!